What Should I Pay Attention To During The Final Acceptance Stage Of Wall Switch Installation?
Date: | Read: 1
Perform final inspection of the main installation. Initially, check that the Wall Switch and sockets are correctly positioned. The basic installation criteria are simplicity, stability, and reliability, ensuring a solid structure, standardized wiring, and safe and reliable operation. Ensure the box appears fully installed without deformation, with a smooth, aesthetically pleasing surface. The overall installation should be both practical and safe.