How To Check Whether The Operation Of The Power Distribution Cabinet Is Qualified
High And Low Voltage Distribution Cabinets The surface of the shell should be flat and smooth, without rust, coating shedding and bump damage. The paint used should meet the requirements of the technical documents. The coating should be firm, uniform, without obvious color difference and reflection.
a. The layout of all electrical components should be reasonable and meet the requirements;
b. The compartments of the incoming line compartment, the outgoing line compartment and the meter compartment are clearly separated;
c. The component model and specifications are consistent with the drawings.
Protective meter box.jpg
Inspection of wire installation in the meter box
a. The current carrying capacity of the wire cross section should meet the standard requirements;
b. When connecting the main circuit components with insulated wires, the DT standard should be used
c. The crimping terminal and the phase sequence color code meet the requirements;
d. The wiring should meet the requirements of the process documents, be neat and beautiful, firm and reliable;
e. The insulated wire is not laid on the conductive parts, and the metal components are protected;
f. There should be no joints in the middle of the connecting wire between two electrical components;
g. Electrical clearance and creepage distance
Use a 1000V megohmmeter to measure the insulation resistance of devices with a rated voltage of 1KV and below, which should be no less than 5 megohms.
a. Before the test, carefully check the internal wiring of the meter box to ensure that it complies with the electrical schematic diagram, confirm that all wiring is correct, and conduct the power-on test only after the insulation resistance meets the requirements;
b. After the components are powered on, there should be voltage at the outlet and it should be correct;
c. There should be no stuck or overload phenomenon in the switch opening and closing test of electrical components;
d. For leakage type components, start the test button and there should be protection action phenomenon;
e. Confirm that the outlets, switches and meter connections of each route correspond to each other and cannot be confused or misplaced.