High-voltage Disconnect Switch Operating Specifications
Date: | Read: 3
Then pull the bus side High Voltage Disconnect Switch, the power supply operation sequence is opposite to the power outage sequence. This is because when an erroneous operation occurs, following the above sequence can reduce the scope of the incident and avoid artificially expanding the incident to the bus.